Yes, I thought about it too. Keeping the front Dana 30 with a 30 (on the tube side)/27 (Hub side so I don't have to replace my hub)
Spline and re-gear. I can add the E-Locker later to contain the cost, although it makes sense to do it together.
And swap the Dana 35 with a Dana 44, re-gear it...