We did the MML first just to be against the grain. It doesn’t really matter anyway. The MM was a bit of a pain, the BL was fast. Thanks to those who provided the pucks. Super nice! All we had to do was go get some hardware from Ace. I told them about the gas filler tube needing lengthening, and I started on it. After 30 minutes I turned it over to them and left. After 20 minutes I went back to check on their progress. ZERO. I told them we could button things up, put the gas cap on and go for a test drive. Before the DS was 18.9* and it shuddered as you stopped on the gas. Now it’s 16.6* and smooth as glass. Big smiles all around when they stomped on the gas and felt it!