Welcome my world. This stuff shouldn't be that hard.Machine shop is swamped. Supplier will work to get the drawings to another machinist.
As of current, the possible lead time: 2-3 months.
Welcome my world. This stuff shouldn't be that hard.Machine shop is swamped. Supplier will work to get the drawings to another machinist.
As of current, the possible lead time: 2-3 months.
Forgive my ignorance, I'm just looking to understand.
Not a lot of machine shops want to take on small projects. And sometimes the cost doesn't outweigh the gain. I’m not looking to make a huge profit, the cost just isnt there so far.You have blueprints and a materials list, but you're looking for a shop to make them?
That is a very real challenge for us small folk who really need machine shops. We fall right in the too small to get anyone's attention to do a job and too big for a small one man operations to do on manual set ups in their garages.No problem.
Not a lot of machine shops want to take on small projects. And sometimes the cost doesn't outweigh the gain. I’m not looking to make a huge profit, the cost just isnt there so far.
they have had no work for 3wks now i've swept every corner and even washed my robots, they keep telling me go look busy.That is a very real challenge for us small folk who really need machine shops. We fall right in the too small to get anyone's attention to do a job and too big for a small one man operations to do on manual set ups in their garages.