P
PNW_LJ
Guest
So I broke a 2 month old U-Joint in half Friday, then this happened Saturday... fun weekend! LOL
View attachment 478199
Time for hydro assist!
So I broke a 2 month old U-Joint in half Friday, then this happened Saturday... fun weekend! LOL
View attachment 478199
Time for hydro assist!
Time for hydro assist!
I’m pretty sure Axle Hill on Pritchett at the first TJFest convinced him he needed hydro assist. He got it shortly after.
I’m pretty sure Axle Hill on Pritchett at the first TJFest convinced him he needed hydro assist. He got it shortly after.
I don’t remember that…
![]()
That’s because you chickened out and followed that JK back out when you saw chewy hill.
Yeah, so scared that after going up he just had to go back down!
Where might I find a set like that? Looks like you have everything.
They are Tekton, 3 sets.. all skipless (1/2 metric for example runs 10mm-38mm).
1. was all chrome sockets including 1/4, 3/8, and 1/2 in deep/std sae/metric
2. was all 1/2 inch sockets deep/std and chrome/metric
3. was full bit socket set
those three make up 95% of whats in that drawer. I know some won't be used often if at all, but I got tired of having to run to the store or mcguiver something because my set's skipped a size. And it makes my OCD feel good![]()
Second Drawer done on my new tool/box setup... couldn't get any toolbox widgets that work well for the thicker extensions, so went with toolganizer... they work fine, basically just 3d printed blocks with holes/magnets. They have different colors available so I went with a different color for each size (1/4, 3/8, 1/2) All new Tekton wratchets and extensions, only thing old in there are the two torque wrenches.
Working on the wrench drawer next I think.
View attachment 495536
Very cool, Dave. You know how much I like organization.
I hope you both are doing well.
Got a third drawer done on my new USG toolbox setup, populated with a new driver set from Tekton... and a set of punches/chisels. Still trying to figure out which wrenches/pliers I want to pick up, those will be the last two major drawers of new tools.
View attachment 499201
View attachment 499200
As Chief Brody said, “You’re gonna need bigger Tool Box…”
![]()
but, but... I just GOT one! lol... still have open drawers, and a ways to go moving from old stuff to new. This whole re-org is probably going to take another 4-6 months before I'm done anyway.![]()