At this point I say I'm a 25% chance of making it. Parts have taken WAY longer to come than expected, current world events have just slowed everything down to a crawl. I just got in my shifter which came in this past week. My adapter is finally being made this week, had delays on the adapter because of a delay on the new input shaft for my NP231 which was a measurement needed for said adapter. I might be able to have my TJ back together this month with a small possibility of getting driveshafts made at the end of January but more than likely I won't get driveshafts made until February now.
IF everything goes back together without any issues that would give me February, March and the beginning of April to make sure everything on my TJ is working for a 4000+ mile round trip to Moab. At this point I just don't know if I'll make it, I think if I have anymore delays I'll have to cancel, I need a few weeks to really test my rig before taking a drive that far.
-Grant