Wait, Victor's an engineer? Victor, how do you turn the switch off to getting to perfection in your work?Two engineers, two methodologies.
I’ll be the third and say get both. One to wheel and one to let sit in the garage with a stack of parts.![]()
Wait, Victor's an engineer? Victor, how do you turn the switch off to getting to perfection in your work?Two engineers, two methodologies.
I’ll be the third and say get both. One to wheel and one to let sit in the garage with a stack of parts.![]()
Wait, Victor's an engineer?
I don't want to ever miss an opportunity to go wheel because my Jeep is sitting on stands, it would drive me crazy. Mine is a toy to go play with and I treat it like a toy.
For others it is a piece of art, for some a daily driver, a resto, a project, a remembrance of a time, time to spend with others, a challenge, a teaching/learning moment, and possibly even a pay check. Whatever it may be, just have fun with it and enjoy the partake and don't take the actual object too serious. There will be an occasional curse word under the breath and a day where nothing goes right, but if you are smiling on most days, you are doing it right.
Did you get another LJ to sit next to the LS in the garage ?![]()
Like I said, Victor, I admire your spirit. Unfortunately, as an engineer, taking the object "too serious" is my way...On a serious note, I don't consider my LJ a toy; rather, it's a tool. A tool that gets me into remote places to do other things. Broken tools aren't very useful to me, so I treat it that way, both when building and using it.
View attachment 680806
As I've noted before, I've been distracted by other, more pressing things for the last few months. The biggest of those distractions is a massive steel stand that holds a 1,500 gallon water tank for our garden five feet off the ground. It's taken many, many fab hours (about 75 pieces in all), but I'm almost done - one more coat of paint (Sunday, 'cuz it's supposed to be rainy tomorrow.) Then I have to pour concrete footers for the legs, and I'm done!
So, today, while literally watching paint dry, I was able to continue modifying the Flux Offroad spare tire carrier. When I last posted about it in Post #768 (way back in October), I was just getting ready to cut lightening holes in it. In between then and now, I cut some of the corner holes with the carbide annular cutter I purchased just for this project, but I didn't post on that. Today, I cut the remaining corner holes with the mag drill:
View attachment 680809
And with all the corner holes cut, I played "connect the dots" with the jigsaw to finish the cutting. Since this is 304 SS, which is hard on tooling, I bought four of these carbide jigsaw blades, hoping they'd do the job:
View attachment 680810
So, with the new tooling in hand, I set to work cutting them out, a task I've been dreading:
View attachment 680811
Those blades worked pretty good! I ended up using a compressed air nozzle blowing full-speed on the blade throughout the cuts because it ran very hot! To cut those five pieces out took about 90 minutes, four M18 High Output Batteries, and I used up three of the four blades in the process.
I then used the Dynabrade mini belt sander to clean up the tangent points, followed by radiusing with a pneumatic chamfering tool and hand sanding with some emery cloth to take the sharp edges off. The finished product, with the new tire plate mocked up:
View attachment 680814
Not quite as pretty as laser-cut holes, but it'll do! Stay tuned...
Total weight on the vehicle with this build, or just the weight associated with the mods to the tire carrier? If the former, it's difficult to say until I'm done - but it will be a large overall weight gain. There's just no way around it. If the latter, I was writing my previous post when you posted, and it contains the answer.Scott, how much weight did you end up removing from start to finish?
Thanks for the kind words. 1-2-3 blocks are incredibly useful! Been using them since the mid-80s. And I, too, am getting old. Much. Too. Quickly. Where does the time go?Excellent work and detail as always. Also love seeing the 1,2,3 blocks in your clamping setup. Brings back memories of the set I made back in 1984 in trade school, also reminds me I'm getting old.![]()
Thanks for the kind words! Watching your work reminds me of how much better I could make things look if I had your skills and perseverance!Watching your work reminds me of how little I know!![]()
Total weight on the vehicle with this build, or just the weight associated with the mods to the tire carrier? If the former, it's difficult to say until I'm done - but it will be a large overall weight gain. There's just no way around it. If the latter, I was writing my previous post when you posted, and it contains the answer.
Thanks for the kind words. 1-2-3 blocks are incredibly useful! Been using them since the mid-80s. And I, too, am getting old. Much. Too. Quickly. Where does the time go?![]()
Now if I only had time to work on the LJ...![]()
Time seems to be in short supply these days.
TJ rub rails next?
TJ rub rails next?
Other projects keep interrupting this build. This weekend, those other projects included: painting some slippery steps off the back porch (with all the rain we've had this spring, both of us have slipped going down them - ouch!), making improvements to my blast cabinet, spraying for bugs in the attic, transplanting two trees for Mrs. sab, re-digging the holes for the garden water tank foundation piers (it's been too wet for weeks to pour the concrete, and they've filled with water and a bit of muddy clay), and welding a cracked plastic fender on the tractor. Have I mentioned that I have too many projects around here? Sheesh!
However, I actually managed to make a little progress on the LJ build today. I bead-blasted and painted the modified Fluxor spare tire carrier:
View attachment 689193
Only a million more tasks to go! I'm taking Thursday and Friday off, so along with Memorial Day, I'll have a 5-day weekend. My main goal is to get the foundation poured for the garden water tank stand. Hopefully, it won't take all five days, and I can get a bit more done on the LJ build. Stay tuned.