I really want to update this thread, but I'm too tired and overworked. We have made progress. Let me correct that, he has made progress. The corner armor on the passenger side is installed and we're painting next Monday. All the painting is happening next Monday. TMR door hinges things are going in. The evap canister was completely removed and all of it treated, painted, and done right. The needle scaler is very helpful getting into tight spots. Let's see, the driver rock slider will go on sometime next week after the painting is all dry. A lot of other stuff including rust treatment has happened. He drives it with the top off and loves it. Oh, I discovered it already has 2" + 1" spacer lift in the front and 2" in the rear with OME Nitrocharger shocks, so I'm assuming this is a typical 2" OME package (just very old). It's rusted to hell so most of it will come off, definitely the shocks. The Walker Evans shocks we have need about a 4.25" suspension lift to get 50:50 travel, so I'll see what I can come up with. We've got some Titan 1" wheel spacers coming (they sent us the wrong ones). The suspension will go on soon. Then the 33's will go on. Hoping to have that done by early September.
That's all I can think of now.
Here's a go anywhere...do anything pic
View attachment 348024