I'd like yall's advice here, I would like to go ahead and install my SYE and order the drive shaft with my Dana 35 currently installed (and maybe stick some Chromoly axles in). I'm not sure how long it will be before I can get my ford 8.8 brackets welded on and axle installed. Im sure the new CV axle with the SYE kit will be different lengths for the Dana 35 vs 8.8 , but maybe once the 8.8 gets installed i can just get another section of drive shaft ( by sending it back to Adams) for the 8.8. So would you say I should install the SYE for now , or wait (could be a while) for he 8.8 to be installed?
thanks
thanks