I finally gave up and turned the heat up even higher around 2 AM.
Second coat is done and drying now.
Now I'll let it dry for 2 days before I remove the plastic and get things ready for the bedliner.
Second coat is done and drying now.
Now I'll let it dry for 2 days before I remove the plastic and get things ready for the bedliner.