Midnight LJR Build

How's the trailer coming along?

Still the same for now.

But the plan is to work on the tub Thursday.

Goal is to be mostly done within next few weeks because I can leave it in the garage and not have to roll it in and out for the Jeep.

At least my part done I’ll still have to get it powder coated and painted.
 
Still the same for now.

But the plan is to work on the tub Thursday.

Goal is to be mostly done within next few weeks because I can leave it in the garage and not have to roll it in and out for the Jeep.

At least my part done I’ll still have to get it powder coated and painted.
Let me know if you want help one day. Maybe the girls could have a play date.
 
  • Like
Reactions: Wildman
Got The fiberglass all trimmed and fitted today all the flare and inner holes drilled.

Rough to do list
-Finish bolting fiberglass pieces together
-Attach fiberglass to floor
-Attach whole tub to frame
-Do all the wiring for light etc
-Install tonneau cover
-Add rock sliders
-Build rack for the roof top tent
-also go to see if I can get my spare set of rubicon flares to work.

E83D01C0-5533-40C5-8664-660CE2CDE174.webp
A36CAFC6-A0BA-4987-8847-A7A9C3B8F926.webp
3FC48648-169E-4096-A505-D4ABFD676999.webp
53CE079B-AA28-4624-9BF2-121B1E906673.webp
CE59609B-4DAA-454E-B52D-1DB83A927122.webp
 
I think my 4x4 harbor freight trailer wins the low standards award, that's 4' x 4' and not 4x4. I was thinking of using these as spare tires but I haven't found adapters for this lug pattern.

trailer.webp
 
The oldest parts are from the late-1940s. The fenders are made from a poorly chopped up boiler tank. When I got it, the tongue was made from 3" water pipe, probably salvaged from the boiler.
20161010_183724.webp

20161010_182719.webp
 
Last edited:
Got The fiberglass all trimmed and fitted today all the flare and inner holes drilled.

Rough to do list
-Finish bolting fiberglass pieces together
-Attach fiberglass to floor
-Attach whole tub to frame
-Do all the wiring for light etc
-Install tonneau cover
-Add rock sliders
-Build rack for the roof top tent
-also go to see if I can get my spare set of rubicon flares to work.

View attachment 183633View attachment 183634View attachment 183635View attachment 183636View attachment 183637
Looking good!
 
  • Like
Reactions: Midnight LJR
Got The fiberglass all trimmed and fitted today all the flare and inner holes drilled.

Rough to do list
-Finish bolting fiberglass pieces together
-Attach fiberglass to floor
-Attach whole tub to frame
-Do all the wiring for light etc
-Install tonneau cover
-Add rock sliders
-Build rack for the roof top tent
-also go to see if I can get my spare set of rubicon flares to work.

View attachment 183633View attachment 183634View attachment 183635View attachment 183636View attachment 183637
Looking awesome Mike!