Can't start a build thread without a place to build

If I had a 40x60 shed/garage/building, I would have 40x60 worth of toys. So jealous of those who live in rural areas with land to do these things. There I live, each house is literally 20 feet from each other.I have a small 2 car garage and 1.5 car carport side by side and that just about takes up the width of my lot. The only three things that keep me from having 6 cars and a boat are 1) no room, 2) insurance is ridiculous in Florida, and 3) a desire to retire before I am 75 (i.e money).

Your building is coming along very nicely. You are gonna need some more TJ's to fill that space. Congrats...
 
  • Like
Reactions: Kathy
If I had a 40x60 shed/garage/building, I would have 40x60 worth of toys. So jealous of those who live in rural areas with land to do these things. There I live, each house is literally 20 feet from each other.I have a small 2 car garage and 1.5 car carport side by side and that just about takes up the width of my lot. The only three things that keep me from having 6 cars and a boat are 1) no room, 2) insurance is ridiculous in Florida, and 3) a desire to retire before I am 75 (i.e money).

Your building is coming along very nicely. You are gonna need some more TJ's to fill that space. Congrats...
It’s a lot of work keeping it all in tip top shape also and always some regristration or something is doe. Lol but it worth the fun and options on what to do.
Poor shed will be almost full already.
 
Well looks like I miss under stood part of our decision for the heated side. I thought only bench and electrical box wall where wood on inside. But all four are wood eight feet up. I don’t know how I want to lay out the bench/ mezzanine side. So I can’t do a ton of electrical there and was going to run all of it outside wall. But now with it being 8 feet all the way around. I took off work today to run all my outlets and light switches. Power for compressor, radiant heat and put in all my welding outlets. So it’s in the wall.
 
A5EE237A-0F5B-46C1-A247-96EDBDAA553C.webp
CA14F59F-7D44-4B3A-8A49-E97DFF2256C9.webp
5FD8E2B8-6CDD-46E3-A3C9-4C64B14F33AA.webp
5458E860-A499-42C8-B0B6-D936427F6232.webp
A3049B02-7251-4AEE-88A2-71850A77312A.webp
2DFFF37B-56C2-493B-81E1-B3AA9281AFE5.webp
B4509C98-BCF3-4F9D-81FA-455231C4DD2C.webp
C0053A38-3F0E-40A4-8CD8-C7CBC00E137B.webp
5458E860-A499-42C8-B0B6-D936427F6232.webp

A3049B02-7251-4AEE-88A2-71850A77312A.webp
2DFFF37B-56C2-493B-81E1-B3AA9281AFE5.webp
C0053A38-3F0E-40A4-8CD8-C7CBC00E137B.webp
A5EE237A-0F5B-46C1-A247-96EDBDAA553C.webp
CA14F59F-7D44-4B3A-8A49-E97DFF2256C9.webp
5FD8E2B8-6CDD-46E3-A3C9-4C64B14F33AA.webp
5458E860-A499-42C8-B0B6-D936427F6232.webp
15740500-9956-400A-BBC3-E4ABE3158FA0.webp
A398EE20-E77B-4957-8AEE-DE31C99FB256.webp
267DCB40-6A09-469C-B2E2-E83E26F28AED.webp
F869BF42-5A29-4136-8966-6FA2A3CEF6E5.webp
9A54CAC0-97E2-4297-8142-D6F644D42C84.webp
I wanted to update the thread. Dave’s had several sleepless nights now that he decided at the last minute to run the electrical in the walls. Progress! Love it ! Can’t wait to post today’s progress.

D2270265-B6E3-4AD7-84DF-95E5C3048214.webp
 
I found a few more pics off of Dave’s phone .
92068F19-6894-4BB7-94E4-ABC109536D8D.webp
Here is one of Dave’s chainsaw creations from one of the big trees.
4DBBB411-0F81-47B8-9C23-4F1788463F00.webp
5768A09B-8BA1-4E8F-9D39-55AE1EE4FDBD.webp
FD2C11D3-A921-4B32-B0D4-62D977DACB55.webp
My son Colin, and the foreman after a long day of logging .
 
Update on progress. They got the ceiling in the finished side.
1D5B3545-A8AC-4B23-A7E5-4F91383B0AA2.webp
7CD78B9F-8EF5-41C6-B70B-8F629F182073.webp
B70845A7-EBEF-4137-BBA9-45C55A33E7AB.webp

Dave got the electrical installed on the finished side after several sleepless nights.
4173ABFE-07AB-4D89-8809-3216E496708C.webp
CDBFDA5A-B7E8-4F97-851E-C85CB2F38B84.webp
E7AC07C5-330B-4B64-943E-0E3E218C7FD7.webp
79D2CCEC-924E-40A0-9C26-50DA30271BDD.webp

This is the outdoor motion light we decided on.
C373F8BD-A7AB-413F-97A0-311BD6C7D1A7.webp
4658AFFD-B9E9-483B-AD43-34A4E79D1C76.webp

We are trying to decide on how to stain the plywood. We were thinking either burning the wood or staining it a gray color. I’m leaning towards the stain as the burnt look is nice in small doses, but a bit much for larger areas. Here’s an example.
69C6643F-5CF8-40F2-8011-F18E6DCD5B48.webp

I’m thinking more gray stained like this.
5966F519-2184-4D30-8E7F-BB7705CC55A6.webp
 
What a sweet shop you are going to enjoy for years. Using metal on the ceiling is a great idea. Keep posting!
 
  • Like
Reactions: Kathy
Update on progress. They got the ceiling in the finished side.
View attachment 35298 View attachment 35299 View attachment 35300
Dave got the electrical installed on the finished side after several sleepless nights.
View attachment 35301 View attachment 35302 View attachment 35303 View attachment 35304
This is the outdoor motion light we decided on.
View attachment 35305 View attachment 35306
We are trying to decide on how to stain the plywood. We were thinking either burning the wood or staining it a gray color. I’m leaning towards the stain as the burnt look is nice in small doses, but a bit much for larger areas. Here’s an example.
View attachment 35307
I’m thinking more gray stained like this.
View attachment 35308
I'd mix it up a bit ...all burnt or all grey could look a bit much...
 
  • Like
Reactions: Baird and Kathy
I’ll have to keep looking at options . Mixing it up is a good ide? Maybe one way behind the workbench and something different on the adjoining wall, . I want to get it done before we start filling it up
 
  • Like
Reactions: Baird and Kiwi TJ
I’ll have to keep looking at options . Mixing it up is a good ide? Maybe one way behind the workbench and something different on the adjoining wall, . I want to get it done before we start filling it up
yeah much easier to do all that stuff while its empty....used to be a thing called a 'feature wall', where you paint one wall one way the rest another which may work for you guys..... the other its just doing the door or surrounds (trim) in the burnt style....which anyway you do it it'll look great :D
 
  • Like
Reactions: Baird and Kathy
The workshop is getting closer to done. The builders are gone. Now we have to get the rest of the electrical done, seal the floor, and stain the walls on the finished side. @Dave K. got it heated up inside enough to start the stain, but the propane ran out . Baby steps. We will get there. I like how the gray stain turned out so far.
FFDAF86E-7C0E-461A-B563-F9E592648781.webp
CD9E7E2D-114F-49F4-9E1E-042D8D440F30.webp
6682D755-026C-4293-B517-0A0EDC5B6DE8.webp
E7A5FB47-2A10-4D8D-95A9-B65668156B9B.webp
E8570F44-67EB-4865-A6CD-559E87172B12.webp
DEA335F7-0D3F-403F-9387-EB6F5734D1AF.webp
 
We Continue to work on the shop. @Dave K. got a lot of the electrical done out there, now I’m sitting without power in the house while he switches out the 100 amp to a 200 box which will eventually cover both the house and shop. We have all but one wall stained the gray, then I guess I need to seal it. Hoping to find somewhere that states it’s fine if I don’t. It is a good arm and leg workout for sure. I can’t wait until we get closer to having it complete. But progress is being made.
3BBF157A-F714-416E-82AD-BA44DE9284DA.webp
562450F7-39F5-4A24-A00F-ECD6E351FBFD.webp

I can’t stand how full daves already got it! How did we live without this space. Now I’m realizing this has given him permission to buy more stuff to fill the space. Ugh.........
5A9619C8-8E23-4080-BBB4-711426078DC5.webp
DC60F862-301F-4DF7-A306-B6A63E8DBF46.webp
88F70480-C8A9-4669-B96A-332E56F2E0F2.webp
Last weekend when my son and his girlfriend were visiting Dave built some steps for my stubby ass to get to the shop. Pretty impressed for his first steps build using scrap wood .
C186756D-60E6-4FD9-BC16-B3CE5CCCE611.webp
Thursday night while Dave worked, my job was to burn a bunch of sticks and vines that Dave pulled down from the trees while the builders had their lift at the house. I like to burn things! I don’t know why Dave and my friend were nervous. Hehe......
CFB39CF3-DD26-46E5-9C95-F1470BE37D3A.webp
 
Well we are making slow progress on the garage. We got the floor sealed, walls stained and sealed, and dave is almost done installing the lift. As suspected, the electrical is still not hooked up. That has turned out to be somewhat of a cluster . But I’m pretty impressed with Dave doing all the wiring in the shop. Now to get it hooked up to the soon to be 200 amp in the house which will also be run to the garage. I can’t wait to start using the lift !
9E71CC0C-A3BE-4618-B74A-2BD0254B75FB.webp
 
wow @Kathy ...Ive seen professional mechanics with less room and no lift and you have it 30 feet from your doorstep haha...awesome job and well done to @Dave K. for all they wiring too...I bet you'll be glad when its all done ?
 
wow @Kathy ...Ive seen professional mechanics with less room and no lift and you have it 30 feet from your doorstep haha...awesome job and well done to @Dave K. for all they wiring too...I bet you'll be glad when its all done ?
I know we will be sitting pretty once it’s done. I have to keep remembering that as we continue to work to get to completion. Dave’s brother came over to fix his car today which he’s never come over since I’ve been with Dave. This garage is going to be good for many reasons it looks like.
 
  • Like
Reactions: JMT and Kiwi TJ